Common problems and precautions of steel pipe scaffolding
2022-03-16
Author:
Views:
Common problems and solutions of scaffolding engineering! The specific content can be specified in the specification "Reliable Technical Specification for Fastener Type Steel Pipe Scaffolding in Construction" (JGJ130-2011)! No special construction plan has been prepared for scaffolding engineering
solution:
1. Before the construction of the scaffolding project, a reliable construction special plan must be prepared separately, and the construction can only be carried out after the approval according to the regulations.
2. Erection of floor-standing steel pipe scaffolding projects with a height of 24m and above; attached integral and segmented lifting scaffolding projects; overhanging scaffolding projects; hanging basket scaffolding projects; self-made unloading platforms and mobile operating platforms projects; new and special-shaped scaffolding projects Not only should the construction plan be compiled, but also the structure calculation book should be compiled, and the approval procedures should be perfect.
3. Construction of floor-standing steel pipe fastener scaffolding with a height of 50m and above; attached integral and segmented lifting scaffolding with a lifting height of 150m and above; cantilevered scaffolding with a frame height of 20m and above; the construction plan needs to be verified by the expert group , the argumentation report has been revised and perfected, and it can be organized and implemented only after it has been signed by the technical director of the construction unit, the chief engineer in charge of the project, and the person in charge of the project of the construction unit.